| Stage | When | Typical cost |
|---|---|---|
| Look | Week 1 | Nothing |
| Measure and draw | Months 1 to 3 | 4 to 7% of the works |
| Schedule and price | Month 3 | Included with the drawings |
| Cut | Months 4 to 7 | Staged against stones completed |
| Set | Months 6 to 9 | Monthly, on valuation |
| Hand back | Month 9 | 5% retained for twelve months |